Rooftop pergolas · louvered & retractable
Keep your rooftop open more hours.
Sun, rain and wind close an open rooftop. A rooftop pergola with a motorized roof keeps it open. We build it for your building.
Get my rooftop pergola priceSee the structure
What a rooftop pergola looks like.



One summer day, 12 pm to midnight
Count the open hours.
No roof
- 12–4 pm: too hot
- 6–8 pm: rain
- 9 pm: too windy
With a Haven roof
- Shade in the heat
- Closed in the rain
- Screens for wind
Example of a hot day with an evening shower.
A rooftop pergola built for up there
Three things every rooftop needs.
We design it for the wind and snow at your building. A licensed engineer checks it.
Light on your roof. That's all the roof weighs.
Rain runs into gutters and down inside the posts. Not onto your guests.
Real rooftops
Rooftop pergolas we built.
Swipe sideways, or use the arrows.






Your numbers
Tap a blue number and type your own.
We have guests up top. Each spends $. Weather closes us days a year.
That's $60,000 a year we don't make.
Keep the rooftop openPergola vs awning vs umbrella vs tent
Why a pergola, not an awning or a tent?
People cover a rooftop four ways. Only one stays up in rain, wind and snow, and looks like part of the building.
Swipe the table sideways →
| Umbrellas | Retractable awning | Rented tent | Haven pergola | |
|---|---|---|---|---|
| Heavy rain | Leaks between | Often pulled in | Wet sides | Water-tight roof |
| Wind | Must close | Must pull in | Flaps, may come down | Engineered for your address |
| Snow | Put away | Put away | Taken down | Haven: 55 psf snow |
| Shade control | Move them around | In or out | Fixed | Tilt, slide or fold the roof |
| Looks | Temporary | Add-on | Temporary | Aluminum structure, any color |
| Lights, heat, walls | No | Limited | Rented | Built in |
Starting now does not mean paying now
Start with a 10% deposit. Not the whole bill.
Permits and engineering take time. Start them now and the pergola is built while the paperwork moves. You do not pay the whole project up front.
- 1Pay a 10% depositThat's all it takes to start.
- 2Drawings and permitsWe prepare drawings and engineering for your permit. This step takes time.
- 3We build it14–16 weeks, made just for you.
- 4It's ready for your seasonOrder by — for Memorial Day.
Summer starts this winter
Send us photos of your roof.
Photos and a rough size are enough. We check what fits and send a price.
- We check the roof with an engineer
- We serve all 50 states
- Payment plans available
Rooftop questions
Can it go on our roof?
Usually yes. An engineer checks your roof first. The roofs weigh 2.6 to 4.2 pounds per square foot.
What about wind?
We design it for the wind at your address. A licensed engineer checks it.
Where does the rain go?
Into gutters and down inside the posts.
Will it block the view?
No. The frames are thin and the roof can open to the sky.
How long does it take?
We build it in 14–16 weeks. Then we install it.
Do you work in my state?
Yes. We serve all 50 states.
Before you go
Before you go: summer starts this winter.
To be ready for Memorial Day, order by —. Order after that and the hottest days stay closed. You start with a 10% deposit.








